BS EN 12350-1 PDF

Buy BS EN TESTING FRESH CONCRETE – PART 1: SAMPLING from SAI Global. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll . This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Goltirisar Nirr
Country: Fiji
Language: English (Spanish)
Genre: Literature
Published (Last): 19 July 2005
Pages: 370
PDF File Size: 18.56 Mb
ePub File Size: 20.73 Mb
ISBN: 115-4-22500-913-7
Downloads: 44374
Price: Free* [*Free Regsitration Required]
Uploader: Sajas

The place else may anybody get that type of info in such a perfect means of writing? Proceed to Checkout Continue Shopping. Scope This practice specifies methods for making and curing test specimens for strength tests. Surface leveling Remove the excess concrete above the upper edge of the mould using the steel trowel or float and carefully level the surface.

The faster, easier way to work with standards. Again there may be more recent versions of the document. Email required Address never made public.

Apparatus Mold Mold use for slump test of fresh concrete Dimension in mm Metallic, Frustum of a cone Alternative materials are allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in increments of 5 mm or smaller Length of at least mm In addition, a scoop is needed.

Protect the sample from the sun, wind, and other sources of rapid evaporation, and from contamination. Ways of how the sample shall be vibrated: Add to Alert PDF. NOTE The requirement for remixing the bd before tests on the fresh concrete, or before making test specimens, is included in the relevant standards.

Clean all the apparatus prior to use. Minimum size of sample x 1. The mold is raised and the concrete allowed sb subside.

Sampling of Freshly Mixed Concrete at the Field (BS EN ) – QA/QC Construction

Their committees work with the manufacturing and service industries, government, businesses and consumers to facilitate the production of British, European and International standards. Gently press the concrete around the TMD at the surface of concrete so that the ambient temperature does not influence the reading.

  ENTROPY JEREMY RIFKIN PDF

Ensure that the compacting rod, or bar, does not forcibly strike the bottom of the mould when compacting the first layer, nor penetrate significantly any previous layer. The report shall include: Record the date and time of sampling. This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling.

There is often debate about the time limit between placing fresh concrete against fresh concrete already placed and compacted i. Move the scoop around the perimeter of the mold to ensure even distribution of material and minimize segregation. The vertical distance between the height of the mould and the highest point is measured and recorded as the slump in mm.

Scoopfuls are taken from four different parts of the load to form the standard sample. This is a very classical question raised by many graduate engineers. You are commenting using your Facebook account.

Where required, the specification of a maximum time between placing layers of concrete should take account of the likely temperature of the concrete, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

This standard is not included in any packages. Report from the sample includes: Concrete having coarse aggregate up to 40 mm in size. Take the scoopfuls of concrete through the moving stream from the truck mixer. For this to occur the delay should be sufficient for the lower layer to develop an initial set or harden. The elapsed time shall not exceed 15 min. Significance and Use The slump test was originally developed to provide a technique to monitor the consistency of unhardened concrete.

BS EN 12350-1/BS EN 12350-2/BS EN 12390-2/BS EN 12390-2

Metallic, Frustum of a cone Alternative materials are allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in increments of 5 mm or smaller Length of at least mm In addition, a scoop is needed. Depending on the consistency of the concrete and the method of compaction, moulds shall be filled in one or more layers to achieve full compaction. Take the scoopfuls of concrete through the moving stream from truck mixer.

  CAB E1 RJ45TE PDF

Materials handling, Test specimens, Sampling methods, Concretes, Samples, Cement and concrete technology. When mixing and sampling of concrete is done in a laboratory, different procedures may be required.

Menu Home Blog About Contact.

BS EN 12350-1:2009

Search all enn by. After this, the design mix specific to the particular type of structure recommends the discharge time limit waived against what is stated in the specifications.

Take the smart route to manage medical device compliance. You are commenting using your Twitter account. Frequency shall be at least vibrations per minute The diameter of the internal vibrator not exceeding one-quarter of the smallest dimension of the test specimen Vibrating table with a minimum frequency of 40 Hz 2 cycles per minute Compacting rod or bar Preparation and filling of the moulds Before filling the mould, cover the inner surface of the mould with a thin film non-reactive release material to prevent the concrete from adhering to the mould.

The Location of concrete represented The Time of casting Compacting Methods 123500-1 Vibrators that will be used should have the following specs: Ideally placing subsequent layers of fresh concrete should be undertaken as soon as practical to enable a fully compacted and monolithic element. In the case of self-compacting concrete, the mould shall be bss in one operation and no mechanical compaction bss be applied during filling or after the mould is filled.

Both parties will agree to the specific time limit as substantiated from the concrete design mix. E the sample from sun, wind, and other sources of rapid evaporation, and from contamination.

Usually, especially for big projects where a large quantity of concrete is cast, both parties come 123550-1 with the designed mix and validated through trial mixes to compensates for this particular problem. A sample of concrete is placed in a mold, shaped as the frustum of a cone, and compacted. The first school of thought is rather straightforward: